
Conductor Stringing Equipment
- Usage/Application
- transmission line
- Material
- MS ,SS
- Dimension/Size
- customizes
- Max Optical fiber cable diameter
- 50 mm cunductor
Gurugram · 14 yrs
is a member of IndiaMART
Following details of the company have been verified

Gurugram · 14 yrs

Transmission & Distribution Lines
Gurugram · 4 yrs

Transmission Lines Work
Gurgaon, Dist. Gurugram · 12 yrs
Shyama Power provides complete turnkey solution for Designing, Sourcing, Erection, Testing and Commissioning of Transmission Lines up to 765 KV. Construction of Transmission Lines involves Survey, Foundation, Erection of Towers, Stringing, Testing and Commissioning of Lines.
Gurgaon, Dist. Gurugram · 13 yrs

Shyama Power provides complete turnkey solution for Designing, Sourcing, Erection, Testing and Commissioning of Transmission Lines up to 765 KV. Construction of Transmission Lines involves Survey, Foundation, Erection of Towers, Stringing, Testing and Commissioning of Lines.
Gurgaon, Dist. Gurugram · 18 yrs

Types : Single/Double Circuit. Voltage : 132-400 KV. Power : 50-500MW.
Gurugram · 13 yrs

Transmission Lines
Gurgaon, Dist. Gurugram · 13 yrs

132KV Transmission Line
Gurgaon, Dist. Gurugram · 11 yrs
Ht/lt Over Head/u.g. Transmission Lines
Gurgaon, Dist. Gurugram · 15 yrs

400 KV Double Circuit AC (430 km) The first power transmission project of 400KVDouble Circuit Transmission System from the Mundra plant to Dehgam (432 kms) has been commissioned in the record time.
Gurgaon, Dist. Gurugram · 12 yrs

High Voltage Transmission Lines up to 765KV Class
Gurgaon, Dist. Gurugram · 11 yrs

The Installation of Transmission Line is done by our expert team of electrical engineers and power engineers. High Voltage Electrical Transmission Towers of up to 400kV can be erected with ease. We are also engaged in fixing Isolators and drawing Conductors, effective and controlled flow of electricity.
Gurgaon, Dist. Gurugram · 15 yrs

Shyama Power provides complete turnkey solution for Designing, Sourcing, Erection, Testing and Commissioning of Transmission Lines up to 765 KV. Construction of Transmission Lines involves Survey, Foundation, Erection of Towers, Stringing, Testing and Commissioning of Lines.
Gurugram · 12 yrs

Transmission Lines
Gurgaon, Dist. Gurugram · 12 yrs

Electrical Transmission Line
Gurgaon, Dist. Gurugram · 12 yrs

Transmission Lines
Gurgaon, Dist. Gurugram · 11 yrs

865 KV Transmission Lines
Gurgaon, Dist. Gurugram · 12 yrs
Isolux Cors n manages more than 5,959 kilometers of lines in India, Brazil and the USA. The group's technical skill-set enables it to provide integrated management spanning all stages of its projects: engineering, line installation, construction of associated substations and system operation & maintenance.With energy demand growing worldwide, due t
Gurgaon, Dist. Gurugram · 14 yrs
Transmission Lines Design, Test, Manufacture & Supply of Towers of all Voltages. Construction of lines in any environment onditions. Great Crossing - Rivers, Mountains, Valleys etc. Turnkey Solutions
Gurgaon, Dist. Gurugram · 11 yrs
Gurugram
Gurgaon, Dist. Gurugram
Gurugram
Gurgaon, Dist. Gurugram